CONTRACT ELECTRONICS MANUFACTURING RFQ CHECKLIST Project: __________________ Revision: __________ Owner: __________________ [ ] 1. Project name, product revision and contact owner. Status / evidence / owner: __________________________________________ [ ] 2. Prototype, pilot and production quantities. Status / evidence / owner: __________________________________________ [ ] 3. BOM with manufacturer names and complete part numbers. Status / evidence / owner: __________________________________________ [ ] 4. PCB fabrication data and stack-up requirements. Status / evidence / owner: __________________________________________ [ ] 5. Component placement file and assembly drawings. Status / evidence / owner: __________________________________________ [ ] 6. Population options, polarity and special process instructions. Status / evidence / owner: __________________________________________ [ ] 7. Firmware, programming and functional test requirements. Status / evidence / owner: __________________________________________ [ ] 8. Enclosure and harness documentation, if applicable. Status / evidence / owner: __________________________________________ [ ] 9. Acceptance criteria, traceability and required records. Status / evidence / owner: __________________________________________ [ ] 10. Packaging, delivery location and target milestones. Status / evidence / owner: __________________________________________ [ ] 11. NDA requirements before sharing confidential design information. Status / evidence / owner: __________________________________________ [ ] 12. Requested quotation breakdown and validity period. Status / evidence / owner: __________________________________________ Mark each line Ready, In progress or Not applicable. Add a document reference and an owner to every open item. Send all suppliers the same released package. https://contractelectronicsmanufacturing.com/resources/rfq-checklist/